References

Estofish Fish Flour Factory 2 × 10 tons per hour steam boiler. We designed and built a boiler house. We started and set up the boiler house, we trained the staff.

Power-to-electrical installation in the scope of the main project. With this project, we built new distribution centers and main distribution systems. We solved the lighting in the workplace because they were very important to the customer. We installed a socket network. Electrical installation and connection of all technological equipment. Installation of cable lugs and lighting tracks. Cabling technology of boiler house. Grounding and bonding.